Tools

All tools and references listed below are available on the electronic Camp Management Toolkit either on the USB memory stick accompanying every hardcopy or from the website: www.cmtoolkit.org.

 

  • Camp Coordination and Camp Management (CCCM) South Africa, 2008. Guidelines for Phase Out and Closure of Centres of Safe Shelter
  • CCCM Cluster, UNHCR/IOM, 2010. Collective Centre Guidelines
  • CCCM Cluster, 2013. Mainstreaming Mine Action in Other Humanitarian Sectors: Shelter and Camps
  • CCCM Cluster, 2013. Temporary Site Planning Checklist
  • Jim Kennedy, 2005. Challenging Camp Design Guidelines
  • Land and Equity Movement in Uganda, 2007. Return or Transformation? Land and the Resettlement of IDPs in Northern Uganda
  • Norwegian Refugee Council (NRC), 2006. Quick Guidelines for Transitional Settlements (or Camp) Site Selection
  • NRC, 2012. A Guide for Monitoring System at Camp Level
  • ProVention Consortium, 2007. Construction Design, Building Standards and Site Selection, Guidance Note 12
  • RedR, 2006. Latrine Decommissioning Training Notes
  • UN-Habitat, 2011. Settlement Planning, Un-Habitat in Disaster and Conflict Context
  • United Nations Refugee Agency (UNHCR). Environmental Considerations for Camp Phase-Out and Closure: A UNHCR Plan of Action
  • UNHCR, NRC, 2013. Internal Camp Regulations, Liberia